This project has 3 parts addressing the problem areas in the yard. For the patio we replaced the old wood timbers with pressure treated 6×6 landscape timbers. We leveled the patio and cleaned the flagstones and replaced the broken ones then filled the joints with polymeric sand. On the second project we added an extension to the carport for a walkway using Pennsylvania Natural Cleft flagstone. The third project was the dry stacked Pennsylvania fieldstone retaining wall.